The joints should be airtight at this point, but I will to follow up with a lightweight (microballoon) top coat next weekend.
Two joints filled - One joint to do |
Filled screw holes in addition to the joints |
Ready for the topping application |
I also need to start working on the inboard wing net attachment tubes.
I'm still waiting on my fabrics to arrive, but I do have some samples that I can put under vacuum to dry out if I end up having enough material to work with.
No comments:
Post a Comment